Free estimator

What will this part actually cost to machine?

Most calculators give you one number and no idea where it came from. CutCost shows every line — material, cycle time, setup, overhead, margin — so you can argue with the number instead of just accepting it.

No signup Runs in your browser Nothing uploaded

Part & process

Estimate

$0.00
per part · 10 pcs · order $0.00 · est. lead 3 days
Cost linePer part
Shop cost per part $0.00
Markup30% on lot cost · $65 line minimum (floor not reached) +$0.00
Working shown: 0 in³ of stock, 0 min of programming and setup per lot, 0 min run time per part. Change any input and every line recalculates.

Constants are back-fitted to the QuotedPart CNC Machining Cost Index — median deviation 5% at qty 10.
Method

How the number is built

Five steps, in the order a shop actually costs a job. Nothing is a mystery multiplier applied at the end.

1. Stock material

You are not charged for the part. You are charged for the piece of stock it was cut from, and stock is bought oversized. We take the finished bounding box, add a 25% allowance for workholding and cleanup, convert to pounds, and price it at small-lot distributor rates — not mill tonnage rates. That difference alone is 3-4x, and it is the single most common error in amateur cost models.

stock = (L × W × H) × 1.25
material = stock × density × $ / lb

2. Run time

Machining minutes are modelled as a power law in envelope volume, then scaled by three things: the material's machinability, the tolerance class, and feature density. The exponent is below 1 because a part twice the size does not take twice as long — the non-cutting time is already in there.

run = 3.67 × V0.559 × material factor × tolerance × features × qty-0.10

3. Setup and programming

146 minutes for a 3-axis job: reading the drawing, CAM, tool assembly, fixturing, first article. This is charged per lot and divided by quantity. It is why one part costs four times what ten parts cost each — not greed, arithmetic.

setup / part = (setup minutes / 60) × shop rate / qty

4. Shop rate

One blended rate covering machine, operator and floor. $110/hr for 3-axis, $132 for 5-axis. When someone quotes you $45/hr, they are either excluding labour or they are not going to be in business next year.

5. Markup

A flat 30% on shop cost, with a $65 minimum per quote line — both constants come from the source index, and both are in the formula below.

price = max( cost × qty × 1.30 , 65 ) / qty

In this calculator the $65 floor almost never binds, and that is worth being honest about. The smallest order you can build here costs $210 before markup — because 146 minutes of programming and setup is charged explicitly, at the top, before any part is made. The floor exists in the index to protect turning shops whose setup is 15 minutes, not 146. Same protection, counted in a different place.

Where these numbers come from

Not from intuition. The stock allowance, shop rates and learning exponent were back-fitted against 88 real priced parts in a public, citable index — see the benchmark section below. The model is reproducible; if you think a constant is wrong, the data is one link away.

Reference data

Material assumptions

These are the exact figures the calculator runs on. Mill prices move — treat them as a starting point, not a contract.

MaterialDensity g/cm³Stock $/lbMachinability ×
Aluminum 6061-T62.709.501.09
Aluminum 7075-T62.8117.051.10
Steel 10187.872.461.33
Steel 4140 PH7.858.421.60
Stainless 3048.006.871.67
Stainless 3168.008.991.73
Titanium 6Al-4V4.4371.702.49
Brass C3608.5014.701.03
Delrin (acetal)1.417.501.00
PEEK1.3260.001.12

Stock prices are small-lot distributor rates per pound, checked November 2026. Shop rates: 3-axis $110/hr · 4-axis $128/hr · 5-axis $132/hr · CNC lathe $100/hr. Machinability is a run-time multiplier relative to Delrin.

Where this estimate will be wrong

Benchmark

We published our error rate

Most calculators never tell you how wrong they are. Here is ours, measured against real priced parts, not against our own opinion.

The QuotedPart CNC Machining Cost Index is a monthly, openly licensed (CC BY 4.0) dataset: 26 representative machined parts plus two reference parts re-priced in ten materials, each at quantities 1, 10, 100 and 1,000, with the cost split out into material, run time, setup and outside finishing.

We took the 88 three-axis milling rows from the November 2026 edition and fitted three constants — the stock allowance, the blended shop rate, and the quantity learning exponent. Everything else in the model is held to the material data published above.

QuantityMedian deviationWhat it means
1 pc0.4%Single-piece quotes land on the index
10 pcs5.5%Typical prototype order
100 pcs4.2%Small production run
All 88 rows5.4% median · 21% at p75Spread comes from feature density

What this does not mean. It does not mean the estimate is right for your part. It means the arithmetic is anchored to something real instead of to a guess, and that the tail — the 25% of parts that deviate more than 21% — is exactly the tail this tool warns you about: thin walls, deep pockets, custom fixtures.

Data: QuotedPart CNC Machining Cost Index, November 2026 — quotedpart.com/cnc-machining-cost-index, licensed CC BY 4.0. Machine rates, setup minutes and markup ($65 line minimum, 30% markup) are as documented in that index's methodology. Constants back-fitted by CutCost; the index authors have not reviewed or endorsed this calculator.

Reality check

Why your quotes don't match each other

Two shops, same drawing, prices 3x apart. It is almost never greed — it is these five things.

They are pricing different quantities

A shop quoting 1 piece and a shop quoting 100 are not answering the same question. Look at the setup line: at qty 1 it can be 60% of the price. Always compare quotes at the same quantity and the same revision of the drawing.

One of them is not charging overhead

A one-person shop with a paid-off machine can quote below a shop with rent and a quality system. That is not a better price, it is a different business — and it becomes your problem when the delivery slips.

Material sourcing is hidden

Buying 6061 as a cut-to-size plate from a distributor costs multiples of mill rate. Ask what stock they are cutting from. It is often 20-30% of the quote.

Tolerance was read differently

"±0.05 unless noted" on a drawing with three tight bores gets interpreted differently by every estimator. Specify per-feature, not in a title block note.

Someone is buying the job

Empty machine, end of month, slow quarter. The price is real, the delivery date is the part that usually breaks. Treat an outlier-low quote as a schedule risk, not a win.

Questions

Frequently asked

Why is the part price so sensitive to quantity?

Programming and setup are one-off costs. On a single part they sit entirely on that part. Spread over 100 parts they become almost invisible. This is why a 1-off quote and a 100-off quote can differ by 4x on identical geometry.

Is this an actual quote?

No. It is an engineering estimate built from published material data and typical shop rates. For a straightforward part it lands within roughly 25% of a real quote. Complex fixtures, thin walls, deep pockets and inspection requirements push real prices above it.

How accurate is this, really?

Against the public QuotedPart index, the median deviation is 0.4% at one piece, 5.5% at ten and 4.2% at one hundred. The 75th percentile is 21% — so one part in four is off by more than a fifth. Those are almost always feature-dense parts, thin walls or jobs that need a custom fixture. If your part looks like that, add 25-40% yourself.

Do you store my dimensions?

No. The calculation runs entirely in your browser. Nothing is sent to a server — you can disconnect from the internet and the calculator keeps working.

Can I use this for injection moulding or sheet metal?

Not yet. The model here is specific to subtractive machining. Sheet metal and moulding have completely different cost drivers — tooling amortisation dominates both — and pretending one model covers all three is how bad estimators get built.

Estimating 20 parts a week?

Pro saves each estimate, exports a branded PDF quote and keeps a price history per material so you stop re-deriving the same numbers.

See what Pro adds